The left lane of Highway 15 towards Edmonton has reopened.
 
A large depression in the pavement was discovered on the highway near the pedestrian bridge.
 
"The repair is complete and the road is stable," said Bradley McDonald, Fort Saskatchewan's manager of infastructure strategies.
 
An small asphalt repair will be required to complete the repair and should take place on September 26, weather depending. The work will require a partial lane closure for a part of the day, but disruption is expected to be minimal.
 
Lane closure delays lasted for about 24 hours.

More Local News

Inter Pipeline still on time and budget after big move

Inter Pipeline’s $3.5-billion petrochemical complex continues to move along smoothly.

Jessica Littlewood staying put as NDP nominee

Current Fort Saskatchewan-Vegreville MLA Jessica Littlewood is sticking around.

Local MLA not seeking re-election

Strathcona-Sherwood Park MLA Estefania Cortes-Vargas will not be seeking re-election this year.

Around 2,200 vehicles to convoy through Fort Sask Tuesday

Tuesday's (Jan.22) drive could get interesting.

Dr. Vincenzo Visconti gets permanent ban in Alberta

A local doctor has been ousted in Alberta.

Fort Sask not using calcium chloride on roads

The City of Fort Saskatchewan continues to use the same de-icing agent as previous years on local roads.

St. Albert resident wins $7.9 million on LOTTO 6/49

An Alberta man recently hit the jackpot.

EIPS kindergarten registration to open next month

It's almost time for parents to register their kids for kindergarten.

Another massive load heading to Industrial Heartland

A second huge piece of equipment is about to travel on our highways.

15 taken into custody after drug bust

Area police detachments have teamed up in a recent drug bust.

DiscoverWestman.com is Westman's only source for community news and information such as weather and classifieds.

Search the Biz Guide

Login